Bathroom Renovation Cost Guide For Toronto

Updated on

A quality bathroom renovation can enhance your daily routine and boost your home’s value, making it one of the most sought-after projects in Toronto. This cost guide provides essential insights and estimates based on 983 verified homeowner reviews. Expect to pay an average of $13,372 for a full renovation, with costs ranging from $1,000 to $50,000. Individual tasks like bathtub installations can start at $500, while shower installations may reach $50,000. Dive deeper for comprehensive budgeting and contractor hiring tips!

Want to get quotes from local pros?

4.9

Top rated Bathroom Renovation Companies

Our Bathroom Renovation Companies, are rated 4.9 out of 5 based on 56 reviews from homeowners like you.

Quality screening

Easily find vetted and reviewed local tradespeople. Just post your job to get free quotes from tradespeople near you across Canada.

A quality bathroom renovation can improve your daily routine and also increase your home’s value. Did you know that bathroom renovations are one of the most expensive and popular projects in Toronto? With companies in high demand, it’s important that you plan your project with precision and hire the right contractor to complete the job.

In this cost guide, we have given an overview of how to complete a bathroom renovation along with cost estimates. These cost estimates are based on 983 verified Toronto-based homeowner reviews on HomeStars. Following this guide, you will be able to plan, budget and hire the right contractor for your Toronto bathroom renovation project.

Bathroom Renovation Costs in Toronto

TaskAverage Cost\ ¹Lowest Reported\ ¹Highest Reported\ ¹
Bathtub Installation$2,050$500$5,000
Faucet Installation$490$136$2,500
Shower Installation$6,901$500$50,000
Sink Installation$556$120$2,100
Tile Installation$4,890$350$27,000
Toilet Installation$998$100$14,000
Whole Bathroom Renovation$13,372$1,000$50,000

Costs as of November 2020*

Bathtub Installation

  • Many homeowners opt to replace their old bathtub if there are multiple cracks in it. They may install a new one or demolish the space and replace it with a shower.

  • If you are only having a new bathtub installed, this is known as a partial bathroom renovation. On average, it may cost you about $2,050 in Toronto.

Faucet Installation

  • Adding a trendy new faucet is a great way to bring some shine into space and increase the value of your bathroom.

  • You can choose any design of faucet which will go with the overall look of your new bathroom. Installing only new faucets may cost you up to $2,500. The cost may vary depending on the number of faucets installed.

Shower Installation

  • Converting the small powder room on the main floor of your house into a functioning shower room or installing a shower room in your basement for guests is a trend in Toronto.
  • A shower installation includes new flooring, tiles on the wall and shower accessories. Based on the size of the room and the type of tiles you choose, it may cost you $6,901 on average to install a shower.

Sink Installation

  • Along with a sink of your choice, some required tools for sink installation are a pipe wrench, a basin wrench, plumbing sockets and plumber’s tape.
  • If you’re planning to add cabinets below the sink, the contractor will have to be cautious while installing the sink and leave ample space around it to attach the cabinet. Excluding the cost of the sink itself, it may cost you to $556 to install a new sink in your bathroom.

Tile Installation

  • There are many different types of tiles you can choose to install in your bathroom. Some of the most popular options include porcelain tile, ceramic, marble, mosaic, limestone, slate vinyl, pebble, terracotta or glass tiles.
  • Your contractor will measure the flooring and give you an estimate of how many tiles you may require. A tile installation may cost you anywhere from $350 to $27,000 based on the size of flooring and type of the tile.

Toilet Installation

  • Replacing or installing a new toilet can create a lot of mess. If you’re not sure how the whole process works, you may end up with a water puddle in your bathroom or a cracked toilet.
  • A professional toilet installation specialist in Toronto will help you with toilet installation or replacement and complete the clean up afterwards. They may charge you $998 on average for their services.

Whole Bathroom Renovation

  • A whole bathroom renovation is a mammoth task that includes changes from floor to ceiling. Building a new bathroom or converting a powder room into a full-bathroom fall into this category.
  • It may cost you up to $50,000 to renovate a whole bathroom excluding the costs for any extra material such as new fixtures and a bathtub.

Factors Impacting Bathroom Renovation Costs in Toronto

Size of the Bathroom

  • The size and number of bathrooms will highly impact the overall cost of your bathroom renovation. Whether you’re planning to renovate a small basement bathroom or a large master bathroom, all the calculations related to area and space will impact the final cost. A contractor will measure the size of the bathroom and provide you with an estimate before starting the renovation work.

Number of Tasks Involved

  • Another important factor that will highly influence the final cost is whether you plan on doing a whole or partial renovation.
  • Installing only fixtures, building just a shower room, installing new tiles or replacing the old bathtub are some of the smaller tasks involved in a larger renovation project. A whole bathroom renovation includes a complete change from ceiling to floor, new fixtures and furniture.
  • The more tasks you add, the more costly the project will be. It will also create more mess.
  • Instead of planning a partial renovation, if you plan to renovate the whole washroom, it will save you time and money.
  • If you are confused about a partial or complete renovation, talk to a local contractor.

Moving Plumbing

  • If you want to change the current position of your sink or bathtub in the renovation process or want to build a new bathroom on the main floor of your house, you will need to move the plumbing.
  • Moving the plumbing of your house can take a lot of time, effort and precision. While moving the plumbing, a contractor will have to be cautious about the water supply pumps, drainage pipes, electrical wires and fixtures underneath the floor and behind the walls. After examining the position of these fixtures and pipes, the contractor will make a carefully curated plan to move the plumbing. Even the smallest mistake in this move can result in a busted pipe, damaged walls and floor, and a great chance for physical injury. That’s why make sure you hire a qualified home renovation contractor if planning to move the plumbing.

Step by Step Guide to a Whole Bathroom Renovation in Toronto

Step 1: Make a List of Tasks

  • Whether you are planning a whole or partial bathroom renovation, start the process by making a list of tasks involved. List all the changes, replacements and any new additions you would like to have. For example, if you want to install a new sink with more cabinet space under it but want to keep the light fixtures in the same position, then specify this in your list.
  • This will help the contractor to get a complete picture of your requirements and to build an estimate for you. A list will also help you identify any specific areas of improvement you might have missed while making the plans in your head.

Step 2: Cleaning and Demolition

  • If you’re planning to renovate the whole bathroom, the contractor will have to demolish the fixtures, tiles, parts of the ceiling and walls as per your requirements.
  • Cleaning and demolition will take a lot of time and will have to be done carefully. If a specific part of the bathroom is demolished by mistake which was not supposed to be torn down, it can cost you heavily to replace or rebuild it.
  • We recommend you be very specific when it comes to any type of demolition as it can’t be undone once started.

Step 3: Install or Repair Drywall, Ceiling and Flooring

  • Hanging new drywall or replacing your popcorn ceiling with a plain ceiling is a qualified painter’s job. Doing these massive tasks will provide a finishing look to your bathroom. A painter can help you with these tasks.
  • After the walls and ceilings, it’s time to add some new flooring to your bathroom. You can choose a pattern and type of tile-based on the colour of your walls and the texture of other fixtures in your bathroom. Based on the size of your bathroom, it may take up to 6-8 hours to install new tiles on the floor.
  • After cleaning and demolishing the floor, the contractor will take measurements of the bathroom to create an estimate of how much material you may require.

Step 4: Bathroom Fixtures: Electrical, Plumbing and Furniture

  • Once the wall, ceiling and tile work are completed, all the heavy work will begin from here. Be it installing a new bathtub or a shower room, these new bathroom fixtures can take up to 2 days to complete.
  • While installing the bathroom fixtures, the contractor will connect them to plumbing and electrical sources as required.
  • After all the heavy fixtures, paintwork and floor work is done, the contractor can install the furniture like shelves and cabinets. Installing the furniture at this stage will protect it from any paint splatter and accidental damages.
  • You can buy the furniture yourself, ask the contractor to buy it on your behalf or just mount the old cabinet with new paint.
  • When you make an initial list in step one, make sure you add these details related to furniture and shelves in it as well.

Step 5: Final Clean Up

  • A renovation project leaves a lot of debris and mess. Be it old furniture and fixtures you want to get rid of, paint clothes, wall and ceiling fragments and empty boxes of new fixtures, everything needs to go into the garbage. Sometimes the size of this debris is 3 times bigger than your garbage can. Here, a contractor will take care of disposing of the garbage without giving you a headache.
  • After the walls and ceilings, it’s time to add some new flooring to your bathroom. You can choose a pattern and type of tile-based on the colour of your walls and the texture of other fixtures in your bathroom. Based on the size of your bathroom, it may take up to 6-8 hours to install new tiles on the floor.
  • After cleaning and demolishing the floor, the contractor will take measurements of the bathroom to create an estimate of how much material you may require.

Important Facts to Remember

  • This step by step procedure will change as per the type and size of your renovation project. A professional bathroom contractor will create a customized step-by-step project plan as per your requirements, budget and timeline.
  • Bathroom renovation contractors employ various other professionals like plumbers, electricians, painters and carpenters. One big benefit of hiring a bathroom company is that they will oversee and coordinate with the other trades. Let your bathroom contractor handle these things, while you relax and choose bathroom flooring patterns or designer lighting fixtures.

By using HomeStars you can make a confident hiring decision by checking a contractor’s Star Score, verification badge and homeowner reviews. Using these tools you can ask any local bathroom renovation expert to provide you with a custom quote for your project as per your requirements.