We had bathtub in our main bathroom which was becoming challenging for us due to our age and the fact that we had to step out over the high sides. We always use the shower, never the bathtub thus the decision to renovate. The company representative came in May and we made our choices but were told that it would be 12-14 weeks before the install. This past Tuesday, Devlin and Scott came to start the project. It was a challenging job, however, they put mats down over the whole area where they needed to carry out the debris. Unfortunately, this demolition took longer than anticipated so they had to leave. Thankfully, they were able to get the water turned back on prior to leaving as it was off most of the day. They returned today(Thursday) as they had a prior commitment that couldnt be changed for Wednesday. They arrived around 10:00 and proceeded to get to work. They worked nonstop finishing the job by 5:30. They did an excellent job, finishing everything with great care and precision. They asked for my opinion when it came to the placement of shelves, grab bars, and the shower set. They worked well as a team with Scott laying down the mats, carrying items up and down the stairs as needed plus he assisted Devlin as required. Even though, it cost considerably more than I expected, the finished project was well worth it.