Master bath renovation and some drywall repairs in basement
Rae Powelson 09/03/2026 - 12:44 PM
How fast can a repair be done
Are you a pro and able to answer this question?
8 Answers
Hidri Contracting
Rating: 5 out of 5
If this bathroom needs to be a gut out job from start to finish it will take 2 weeks.
Other repairs 1-3 days .
Hope my answer helps you.
Hidri Contracting INC.
Answered26 February 2026
0
Remodel Construction Company
Rating: 5 out of 5
Good morning just dime dimple repairs 1-3 days. For a full renovation it usually takes 12-15 working Days depending on the scope of the work.
Chris
Remodel Construction Co.
Answered26 February 2026
0
Granstone
Rating: 5 out of 5
Hi Rae, it really depends on what’s involved. A full master bath renovation usually takes around 2 to 4 weeks, depending on whether plumbing is being moved and what finishes you choose. If it’s more of a refresh without major changes, it can be quicker.
For basement drywall repairs, small patches can often be done in a day or two. Larger or water-damaged areas may take longer.
Granstone Team
Answered26 February 2026
0
Universal marble
Rating: 5 out of 5
A full bathroom renovation we typically do in 5 working days with high end stone work and finishes
Answered26 February 2026
0
Lamberts Contracting
Rating: 4.9 out of 5
Drywall damage would take about i day. A complete bath reno is usually two weeks or less
Answered3 March 2026
0
Anonymous user
Cela peut prendre 2 jours environs merci
Answered3 March 2026
0
Aje Carpenter
No reviews yet
The timeline depends on the extent of the work, but generally a master bathroom renovation with minor drywall repairs in the basement can take between 3 to 7 days.
• Day 1–2: Demolition, preparation, and drywall repair in the basement
• Day 3–5: Bathroom installation work (fixtures, drywall, finishing)
• Day 6–7: Final touches, sanding, painting, and cleanup
If the repairs are small and materials are ready, some jobs can be completed in as little as 2–3 days.
I always recommend a quick on-site inspection or photos of the areas to give a more accurate timeline and quote. I focus on quality work, proper preparation, and clean finishing so the results last.
Answered6 March 2026
0
Sum It Roofing Inc
Rating: 4.8 out of 5
If there no plumbing issues to correct, then the work can start in a couple days and be completed in a 1-2 weeks.
Answered9 March 2026